EasyManua.ls Logo

Samsung IWA Series - 슬라이드 번호 84

Samsung IWA Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
83
After installing the CABINET, fix the X-axis position by fastening the screw on the side and
the Z-axis position using a magnet.
※ Connect the outermost 2 points of the CABINET (Fig. 1)
※ A magnet is attached to fix the Z-axis of the surface where the CABINETs meet (Fig. 1).
1 2 3 4
7 8 9 10
13 14 15 16
19 20 21 22
25 26 27 28
5
11
17
23
29
31 32 33 34 35
6
12
18
36
24
30
Fig.1 Fixing the X-axis position and attaching magnets by fastening the screw on the side
20x20 magnet
(Frame kit included)
CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. Cabinet + Frame installation
-
+
MAGNET
CASE 1 ) When there is no Z step: No separate
attachment specifications
CASE 2 ) In case of step difference: Attach 2 magnets
so that the sheet faces toward the “-” side
(Sheet can be additionally attached depending on the
level of the step)

Table of Contents

Related product manuals