LED R&D Lab(VD)
49
Installation order : FRAME CABINET
Frame Left
Separate Assy frame Vertical
Adjustment of flatness between walls
using Spacer-ETC
Adjust horizontals, verticals and fix the screw
Connection between upper and lower
cabinets using brackets
Install the cabinets of first level.
After installing 2nd level, fasten the
SIDE screws to fix modules.
Install horizontal shared side (Sliding)
Laser Level
Frame Right
Assy frame H
Assy frame V
Frame Right
Frame Left
Attach Assy frame H to Assy frame V
3. Frame kit Components