EasyManua.ls Logo

Samsung IWA Series - 슬라이드 번호 82

Samsung IWA Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
81
When installing docking, check the Z-axis step between upper and lower CABINETs.
※ If a step occurs, use an absorber to open the gap and then fix the gap using a Gap Tool (Fig. 1).
※ Adjust the SEAM using the assembled horizontal sharing surface (using the supplied 1.5mm wrench).
: The left side controls the bottom and the right side controls the top part (Fig. 2).
※ When detaching and reinstalling the top CABINET, Return the SEAM screw to initial position to prevent deformation.(Fig.3)***
Fig.1 Secure Gap with upper/lower CABINET adsorber and fix with Gap Tool
Fig.2 Z-axis step adjustment
Un-Lock
Lock
Adsorber
※ After inserting it in the horizontal direction,
it is fixed by turning it vertically.
1
2
A/S-ASSY GAP TOOL
(BN81-17113A)
CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. Cabinet + Frame installation
Fig.3 SEAM Screw Return

Table of Contents

Related product manuals