LED R&D Lab(VD)
81
⑧ When installing docking, check the Z-axis step between upper and lower CABINETs.
※ If a step occurs, use an absorber to open the gap and then fix the gap using a Gap Tool (Fig. 1).
※ Adjust the SEAM using the assembled horizontal sharing surface (using the supplied 1.5mm wrench).
: The left side controls the bottom and the right side controls the top part (Fig. 2).
※ When detaching and reinstalling the top CABINET, Return the SEAM screw to initial position to prevent deformation.(Fig.3)***
Fig.1 Secure Gap with upper/lower CABINET adsorber and fix with Gap Tool
Fig.2 Z-axis step adjustment
Un-Lock
Lock
Adsorber
※ After inserting it in the horizontal direction,
it is fixed by turning it vertically.
1
2
A/S-ASSY GAP TOOL
(BN81-17113A)
◇ CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. Cabinet + Frame installation
Fig.3 SEAM Screw Return