EasyManua.ls Logo

Samsung IWA Series - 4. Frame installation

Samsung IWA Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
56
4. Frame installation
Assemble ASSY FRAME VERTICAL and ASSY FRAME H
※ Work on a flat floor.
- Position of ASSY FRAME VERTICAL IG for I/G BOX and BRIDGE BOX arrangement is autonomous (Fig.1)
- Assemble the STUD guide carefully according to the single/extended installation specification (Fig.2-1/Fig.2-2)
- Fasten the SCREW (M6,L12) (Fig. 3)
- Fix ASSY FRAME H using SCREW (FH,M4,L6) (Fig.4)
Fig.1 ASSY FRAME VERTICAL, ASSY FRAME H assembly
ASSY FRAME VERTICAL I/G
ASSY FRAME
VERTICAL
ASSY FRAME
VERTICAL
ASSY FRAME
VERTICAL R
ASSY FRAME
VERTICAL L
ASSY
FRAME H
ASSY
FRAME H
Fig.3 SCREW(M6,L12) fastened with STUD as a guide
Fig.2-1 Separate installation (bracket joint separation)
Fig.2-2 Extended installation (note the guide position)
M6,L12
M6,L12
M6,L12
M6,L12
STUD STUD
STUD
STUD
M6,L12 SCREW
Separation when
installed alone
M6,L12
M6,L12
STUD GUIDE
STUD GUIDE
Fig.4 Fix the FRAME H with SCREW(M4,L6)

Table of Contents

Related product manuals