EasyManua.ls Logo

Samsung IWA Series - 슬라이드 번호 68

Samsung IWA Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
67
CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
(Intall the I/G at the top) Be careful about the interference with CABINET COVER-POWER.
※ Position the SWITCH of the I / G toward the wall. (Fig.1)
Placse the I/G on the edge line of Frame(X-Axis) and the top line of the magnet(Y-Axis). (Fig.2)
5. Cabinet + Frame installation
I/G
B/BOX
Y-Axis Guide
1
st
Magnet Top line
X-Axis Guide
Bracket Edge
Overlap
Install the IG
switch to the Bottom
Fig.1 Switch Direction
Fig.2 X-Y Position Guide
Watch out for interference.

Table of Contents

Related product manuals