LED R&D Lab(VD)
60
4. Frame 설치
- Move and assemble two upper/lower STUDs assembled in the FRAME VERTICAL LEFT. (Fig.2)
* As shown in the figure, make sure to move both the upper and lower STUDs. (Fig.3)
* Adjust both FRAME VERTICAL LEFT and RIGHT can be adjusted up to 1.0mm.
* If it is installed on the wall, adjust the amount of wall-mounted screw fastening so that the right FRAME KIT can be moved.
- Reassemble the BRACKET-SUPPORT using screws (BH,M4,L6) in the ASSY FRAME VERTICAL. (Fig.4)
- Fix ASSY FRAME H using SCREW (FH,M4,L6) (Fig.5)
BEFORE
Fig.2 STUD location Movement
Fig.4 Assemble the Bracket-Support with screws
AFTER
BEFORE
AFTER
Fig.5 Fasten the screw to fix the FRAME H
Fig.3 Check the STUD position