LED R&D Lab(VD)
41
◆ Preparations before installation
⑩ The Cabinets installed on the top line works as follows.
1) Take out the Cabinet and lay it down on the Cushion-BOT. (Take out the cushion from the box as well.)
2) Detach the Module frame and main frame.
3) Remove the Top Docking Screws.
4) Lower the Top Docking and fixed the screws.
2. Preparation for Cabinet Installation
1) 2)
3) ~ 4)