EasyManua.ls Logo

Samsung IWA Series - 2. Preparation for Cabinet Installation

Samsung IWA Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
36
Preparations before installation
Check whether there is any abnormality on the
screen by connecting the power cable.
(Fig.4)
※ Before checking the screen, remove the PAD-SHEET and attach the SPACER-EVA.
Remove 4 screws to disassemble cover-corners. (Fig.5)
※ When removing cover-corners, place cushion-TOP first on the
ground and then lay down the Cabinets to prevent Cabinets from
warpage. Then remove the cover-corners.
Fig.5 Cover Corner Removal
SCREW POINT
CUSHION-TOP
OX
2. Preparation for Cabinet Installation
Switch (Toggle)
Fig.4 Before checking the screen, remove PAD-SHEET
and attach SPACER-EVA
PAD-SHEET
Attaching Spacer-Eva
to Bracket-Frame
Guide Line
Spacer-Eva

Table of Contents

Related product manuals