EasyManua.ls Logo

Samsung IWA Series - 5. Cabinet + Frame installation

Samsung IWA Series
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
77
5. Cabinet + Frame installation
※ Large screen installation guide (8x8 or more)
- Instead of horizontal installation, which is the conventional installation method, it proceeds with a step-by-step installation method.
- After installing the first stage and leveling it, stack it up to the top based on the first cabinet.
- If you need to adjust the z-axis step while installing the cabinet from the 2nd stage, remove the cabinet installed at the bottom of the next
cabinet, adjust it, and then reinstall it.(Fig.1)
* The reason for separating the cabinet is to facilitate movement between cabinets when adjusting the step difference.
LED
LED
LED 2 4 N
N+1
N+2
General screen installation method Fig.1 Large screen installation method
If adjustment is necessary as shown in the figure, work after removing the cabinet
조절이 필요한 포인트

Table of Contents

Related product manuals