LED R&D Lab(VD)
208
• Recommended to install in 19 inch Server rack
• When using the Multi Link HDR function
Multi Link HDR Port
Multi Link HDR Port
① The rubber stopper of the Multi Link HDR Port is open.
② Connect the connector of the Multi Link HDR Cable (sold
separately) to the Multi Link HDR Port of each S-Box (※ Caution:
Connect the connector structure facing up)
③ Menu-Picture-LED HDR-Multi Link HDR Settings-ON
④ Setting the number of connected S-Box (2/3/4)
⑤ S-Box ID Setting (※ Caution: It is necessary to set the ID so that ID
does not overlap between connected S-Boxes)
UP
SIDE
(Only for SBB-SNOWJMU)
Appendix 2 - S-Box Installation and Connection