LED R&D Lab(VD)
36
◆ Preparations before installation
④ Check whether there is any abnormality on the
screen by connecting the power cable.
(Fig.4)
※ Before checking the screen, remove the PAD-SHEET and attach the SPACER-EVA.
⑤ Remove 4 screws to disassemble cover-corners. (Fig.5)
※ When removing cover-corners, place cushion-TOP first on the
ground and then lay down the Cabinets to prevent Cabinets from
warpage. Then remove the cover-corners.
Fig.5 Cover Corner Removal
SCREW POINT
CUSHION-TOP
OX
2. Preparation for Cabinet Installation
Switch (Toggle)
Fig.4 Before checking the screen, remove PAD-SHEET
and attach SPACER-EVA
PAD-SHEET
Attaching Spacer-Eva
to Bracket-Frame
Guide Line
Spacer-Eva