LED R&D Lab(VD)
67
◇ CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
① (Intall the I/G at the top) Be careful about the interference with CABINET COVER-POWER.
※ Position the SWITCH of the I / G toward the wall. (Fig.1)
※ Placse the I/G on the edge line of Frame(X-Axis) and the top line of the magnet(Y-Axis). (Fig.2)
5. Cabinet + Frame installation
I/G
B/BOX
Y-Axis Guide
1
st
Magnet Top line
X-Axis Guide
Bracket Edge
Overlap
Install the IG
※ switch to the Bottom
Fig.1 Switch Direction
Fig.2 X-Y Position Guide
Watch out for interference.