EasyManua.ls Logo

Samsung LH0 IWA W - Check for screen abnormalities

Samsung LH0 IWA W
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
35
2. Preparation for Cabinet Installation
Preparations before installation
Remove the Box tape at the upper area and then open up the box. (Fig.2)
Remove the Top-cushion and bag shielding. Grab the handle inside, take out the cabinet and open Al-Bag.
Then remove the filament-tape and PAD-EPE.
Check if the Sliding Bolts are fixed well.
(Fig.3)
Fig.1 Packing
Component
Fig. 2 Opening of Box Fig.3 Check the Bolt
Al-Bag
Open Bag Zipper
SLIDING BOLT
LED set
Box
Top-Cushion
Bottom-Cushion
Accessory

Table of Contents

Related product manuals