EasyManua.ls Logo

Samsung LH0 IWA W - 1. Product Information and Installation Precautions

Samsung LH0 IWA W
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
31
Guide for docking connection error (Mechanical)
Check Cabinet status.
- Additional insertion is carried out by applying a load on the bracket-frame to prevent cabinet not inserted.
※ When applying the load, apply the load only to BRACKET-FRAME so that there is no damage to the LED module.
Check Docking connection status
Check the status after pressing Docking in the up-down direction. (Fig1. )
Remove the four screws for docking and press them again in the up-down direction.
After checking the status, fasten the four screws and fix the docking. (Fig2. )
If a connection error occurs again after fastening four screws,
remove two screws for the upper dock (bottom of the cabinet standard)
and press them in the up-down direction to check the connection status. (Fig3. )
LED Module
BRACKET-FRAME
1. Product Information and Installation Precautions
Upper Docking
Lower Docking
Screw
Screw
Remove
Fastening
the Screw
Screw
Remove
Fig1. Up-Down direction
Fig2. Up-Down direction + Screw rework Fig3. Remove two screws.
Screw

Table of Contents

Related product manuals