LED R&D Lab(VD)
42
◆ Preparations before installation (Refer to if necessary to disassemble the module)
※ Module frame assembly / disassembly in detail
1) Disassembly
Lay down the Cabinet
on the cushion.
Detach the Frame.
(It is easier to separate them one by one than to separate them into a bucket)
2) Assembly
Push the middle side.
(Main board and bridge board docking part)
Put down the frame according to the guide of the separated module.
(After matching the upper left and right holes, put it down.)
2. Preparation for Cabinet Installation