※ Step 1 If the last CABINET is the even number, connect by installing I/G on the side frame of the last CABINET.(Fig.1).
※ If the last CABINET in the first stage is an odd number, I/G is installed on the side frame of the last CABINET in the top to
connect.(Fig.2)
※ For more information on IG location, refer to Chapter 9 Power and Cable Connection.
1
even
I/G
B/BOX
I/G
Fig.1 I/G placement when the last is an even numbered CABINET Fig.2 I/G placement when the last is an odd-numbered CABINET
1
odd
I/G
B/BOX
I/G
last
◇ CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]