EasyManua.ls Logo

Samsung LH0 IWA W

Samsung LH0 IWA W
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
56
4. Frame installation
Assemble ASSY FRAME VERTICAL and ASSY FRAME H
※ Work on a flat floor.
- Position of ASSY FRAME VERTICAL IG for I/G BOX and BRIDGE BOX arrangement is autonomous (Fig.1)
- Assemble the STUD guide carefully according to the single/extended installation specification (Fig.2-1/Fig.2-2)
- Fasten the SCREW (M6,L12) (Fig. 3)
- Fix ASSY FRAME H using SCREW (FH,M4,L6) (Fig.4)
Fig.1 ASSY FRAME VERTICAL, ASSY FRAME H assembly
ASSY FRAME VERTICAL I/G
ASSY FRAME
VERTICAL
ASSY FRAME
VERTICAL
ASSY FRAME
VERTICAL R
ASSY FRAME
VERTICAL L
ASSY
FRAME H
ASSY
FRAME H
Fig.3 SCREW(M6,L12) fastened with STUD as a guide
Fig.2-1 Separate installation (bracket joint separation)
Fig.2-2 Extended installation (note the guide position)
M6,L12
M6,L12
M6,L12
M6,L12
STUD STUD
STUD
STUD
M6,L12 SCREW
Separation when
installed alone
M6,L12
M6,L12
STUD GUIDE
STUD GUIDE
Fig.4 Fix the FRAME H with SCREW(M4,L6)

Table of Contents

Related product manuals