LED R&D Lab(VD)
37
◆ Preparations before installation
DOCKING (BOTTOM)
DOCKING (TOP)
SWICHAC Power Input
DOCKING (TOP w/ Cover)
DOCKING (BOTTOM w/ Cover)
※ Cover to prevent exposure of the power supply
/ Proceed to delete before assembly
2. Preparation for Cabinet Installation
※ Cover to prevent exposure of the power supply
/ Proceed to delete before assembly