LED R&D Lab(VD)
74
③ Before installing 1
st
CABINET, connect the I/G and DATA cables.(Fig.1)
※ Use the DATA cables enclosed in S-Box
※ Connect the connected I/G and BRIDGE BOX to the external S-BOX.
Fig.1 Connect 1st CABINET and I/G CABLE
I/G
DATA IN
DATA OUT
◇ CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. Cabinet + Frame installation