EasyManua.ls Logo

Samsung LH0 IWA W

Samsung LH0 IWA W
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
75
After installing each of the first CABINETs, 󵷕󵷕proceed by connecting the power cable from
the side
. (Fig.1)
Connect the POWER CABLE by pressing it with your hand until you hear a “click” sound.(Fig.2)
※ Arrange the cables by using a fixed hanger shape.
Fig.1 After installing CABINET, connect POWER CABLE
POWER CABLE
Fig.2 Press until you hear a “click” sound
CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. Cabinet + Frame installation

Table of Contents

Related product manuals