EasyManua.ls Logo

Samsung LH0 IWA W - Dehumidification guidance - during installation

Samsung LH0 IWA W
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
5
How to install the screen in the case that dehumidification is necessary.
3. While installing cabinets, S-Box should play only this pattern.
Check S-Box shows the pattern through monitor connected to S-Box service port.
After installing each cabinet, check whether the pattern is shown in it.
OCM cable connection can be checked through this.
Before turning off S-Box, turn off the cabinets, first.
After being sure S-Box plays this pattern, turn on the cabinets.
4. After completing installation of cabinets, start 24hr dehumidification process.
5. After finishing 24hr dehumidification process, do edge correction and module calibration.
Dehumidification guidance during installation
This contents must be noticed to customer.
Please print this page and hand it to user.

Table of Contents

Related product manuals