4. Frame installation
※ Refrence1. Frame extension in vertical direction
- FRAME H and FRAME V placed as extended installation specifications (Fig.1)
- Arrangement of spare JOINT H and HOLDER-MAGNET as extended installation specifications (Fig.2)
- In the same way as a single installation, connect the frame V/H using M6, L12 SCREW, and connect the BRACKET-JOINT with M3, L8 SCREW
between HOLDER-MAGNET VERTICAL.
Fig.2 Assembling with consideration of the location of the
fastening hole/guide hole as an extended specification
Fig.1 Vertical/horizontal extension installation