EasyManua.ls Logo

Samsung LH0 IWA W - 슬라이드 번호 67

Samsung LH0 IWA W
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
66
CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
(Intall the I/G at the bottom) Before installing CABINET, connect and arrange cables to I/G and BRIDGE BOX.(Fig.1)
※ CABINET No. 1 starts at the bottom left, and I/G is placed at the top right of CABINET No. 1 (attached by magnet).
※ I/G and BRIDGE BOX are connected to each other via USB 3.0, and each sensor and S-BOX are connected (Fig. 2).
※ In case of IFA model, BRIDGE BOX and sensor are not needed when installing with SNOWJMU.
Fig.1 I/G and B/BOX arrangement
5. Cabinet + Frame installation
Fig.2 I/G, B/BOX, sensor cable connection
I/G
B/BOX
B/BOX
I/G
Illuminance sensor
Bluetooth/wifi
USB type C connection
S-BOX(Optical cable connection)

Table of Contents

Related product manuals