BioPAT
®
Trace | Multi Trace Operating Instructions 49
Initial Installation
Verify the proper placement of the pump
cassettes.
After installing the pumps and valves on the front
of the device, attach the sensor, drip chambers
and diffusion module to the side panel.
The adjacent figure shows a completely
assembled side panel.
First, insert the conductivity cell into the
measurement amplifier holder:
t To do so, unscrew the knurled nut on the
upper retaining plate to allow it to be pushed
upwards.
t Next, place the lower edge of the conductivity
cell into the recess in the lower border of the
retaining plate.