50 BioPAT
®
Trace | Multi Trace Operating Instructions
Initial Installation
t Leverage the conductivity cell up onto the
contact plug. While doing so, pull the upper
retaining plate slightly upwards.
t Press the conductivity cell onto the holder
and slide the retaining plate downwards.
The conductivity cell is fastened to the device by
tightening the knurled nut.
Fig. 16: BioPAT
®
Trace tubing set dialysis