EasyManua.ls Logo

SBC PCD3 Series - Planning PCD3 Applications

SBC PCD3 Series
133 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Saia-Burgess Controls AG
Hardware manual for PCD3 series │ Document 26-789 ENG19│ 2018-06-29
Planning an application
Guidance
2-4
2
2.4 Planning an application
The following aspects should be considered when planning PCD3 applica-
tions:
- The internal load current taken by the I/O modules from the +5V and +V supply
mustnotexceedthemaximumsupplycurrentspeciedfortheCPUs,RIOsor
LIOs (PCD3.C200)
- TheCPUorRIOtypespeciesthemaximumnumberofmodulecarriersand
modules
- AftervePCD3.C100modulecarriers,useaPCD3.C200baseunitasI/Obus
amplier.
- Inkeepingwithleanautomation,itisrecommendedtoleavetherstslotinthe
CPU basic module free for any subsequent expansions. Both simple I/O mod-
ules and communication modules can be used in this slot.
- The total length of the I/O bus is limited to 15 LIO modules by technical factors;
the shorter, the better.
The PCD3.C200 is used to extend the I/O bus or for the internal power sup-
ply (+5V and +V (24V)) to a module segment.
Please note the following rules:
- DonotusemorethansixPCD3.C200sinasingleconguration,orthetime
delay will exceed the I/O access time.
- AmaximumofvecablesPCD3.K106/.K116maybeused.
100
Saia PCD3.C
100
Saia PCD3.C
200
Saia PCD3.C
6860
ETH 2.1 ETH 2.2
Ethernet 2
USB
Saia PCD3.M
100
Saia PCD3.C
100
Saia PCD3.C
Extension plug
PCD3.K010
Extension cable
PCD3.K106/PCD3.K116
Series 0
Series 1
- Insert a PCD3.C200 after each cable (at the start of a row).
Exception:Inasmallcongurationwithnomorethan3PCD3.C1xxs,these
can be supplied from the PCD3.Mxxxx. A PCD3.C200 is not required.

Table of Contents

Related product manuals