PFA-100 System – Instruction Manual (US) – Version 1.0.1
23
3 Delivery and installation
3.1.2.1 Accepting delivery
Immediately after delivery, check the PFA-100 System as follows:
1. Check the transport box for signs of external damage before opening.
2. Check the delivery for completeness (see Chapter 3.1.2.3) and intact
condition immediately after opening.
3. Inform your Siemens Healthcare Diagnostics Service immediately if
anything is missing or damaged.
3.1.2.2 Unpacking
To unpack the PFA-100 System after delivery, proceed as follows:
1. Remove the accessories box.
2. Remove the foam packing.