Commissioning
6.5 Basic commissioning
SIMATIC ET 200pro FC-2 converter
78 Operating Instructions, 04/2015, FW V4.7.3, A5E34257324B AB
● The installed STARTER V4.3 or higher.
Updates for STARTER are available under the following link: STARTER download
(http://support.automation.siemens.com/WW/view/en/10804985/133100)
● An appropriate USB cable.
Overview of basic commissioning
Basic commissioning using a PC essentially consists of the following steps:
1. Creating a project
2. Integrate an inverter into the project
3. Go online and start basic commissioning
4. Carry out basic commissioning
5. Identify motor data
Steps 1-5 are described below.
Creating a project
Creating a project
Procedure
In order to create a new project, proceed as follows:
1. In the menu, select "Project" → "New…".
2. Specify a name of your choice for the project.
You have created a new project.
Transfer inverters connected via USB into the project
Transferring inverters connected via USB to the project
Procedure
Proceed as follows to transfer an inverter connected via USB to your project:
1. Switch on the inverter power supply.
2. First insert a USB cable into your PC and then into the inverter.
3. The PC operating system installs the USB driver when you are connecting the inverter
and PC together for the first time.
– Windows 7 installs the driver automatically.
– For Windows XP you must acknowledge several system messages.
4. Start the STARTER commissioning software.