Commissioning
6.5 Basic commissioning
SIMATIC ET 200pro FC-2 converter
74 Operating Instructions, 04/2015, FW V4.7.3, A5E34257324B AB
6.5
Basic commissioning
6.5.1
Basic commissioning with the IOP operator panel
Basic commissioning wizard
Procedure
For performing the basic commissioning of the converter with the IOP operator panel,
proceed the following steps:
1.
Select "Basic Commissioning..." from the Wizards
menu.
2.
Select "Yes" or "No" to a factory reset.
The factory reset is performed prior to saving all the
parameter changes that have been made during the
basic commissioning process.
3.
Select the Control Mode for the attached motor.
4.
Select the correct Motor Data for your Inverter and a
t-
tached motor.
This data is used to calulate the correct speed and di
s-
played values for the application.