Commissioning
6.5 Basic commissioning
SIMATIC ET 200pro FC-2 converter
Operating Instructions, 04/2015, FW V4.7.3, A5E34257324B AB
83
4. Switch on the motor.
The inverter starts the motor data identification. This measurement can take several
minutes. After the measurement, the inverter switches off the motor.
5. Relinquish the master control after the motor data identification.
6. Press button
(RAM to ROM).
You have completed the motor data identification.
Self-optimization of the speed control
If you have selected not only motor data identification but also rotating measurement with
self-optimization of the speed control, you must switch on the motor again as described
above and wait for the optimization run to finish.