EasyManua.ls Logo

Siemens SIMATIC S5 ET 200U - Page 91

Siemens SIMATIC S5 ET 200U
383 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-24
ET 200U Distributed I/O Station
EWA 4NEB 812 6087–02b
FORCE with load circuit turned on :You can observe the effect of the
forced outputs directly at the I/Os.
!
Caution
Setting outputs when the load circuit is turned on can result in dangerous
system states.
Set or reset outputs only under the circumstances listed in the following ta-
ble!
Table 4-6 Resetting Outputs with Load Circuit Turned on
Version Outputs are Reset ... Outputs are not Reset ...
IM 308–B (up to
version 4)
or
E(E)PROM pro-
grammed as ver-
sion v 2
*
When you power up the IM 308–B
master interface module (STOP ³
RUN transition)
When you call up the “MODULE
SELECTION” screen.
When you reset the outputs in the
“MODULE SELECTION” screen.
When you exit from the “MODULE
SELECTION” screen with <F8>
(EXIT).
IM 308–B (from
version 5)
and
E(E)PROM pro-
grammed as ver-
sion w 3
*
When you call up the “MODULE
SELECTION” screen.
When you reset the outputs in the
“MODULE SELECTION” screen.
When you exit from the “MODULE
SELECTION” screen with <F8>
(EXIT).
When you power up the IM 308–B
master interface module (STOP to
RUN transition)
*: The E(E)PROM version is defined when programming the E(E)PROM. If you have selected
<F3> (as in version 2) after the message “Evaluation of diagnosis in CPU to DP Standard?
(<F3>: as in version 2)” has been displayed, the E(E)PROM is programmed as in version 2.
ET 200U(DP Siemens): AddressAssignment,Starting–Up,Diagnosing Faults Using COMET200

Table of Contents

Related product manuals