EasyManua.ls Logo

Strasbaugh 7AA - Basic Operation

Strasbaugh 7AA
283 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Strasbaugh Operator Functions
Version 1.2 - April 18, 1996 4 - 13
BASIC OPERATION
Note: For information on error conditions, including error condition
lights and servo error codes, refer to the Troubleshooting
chapter of this manual.
SUMMARY
The list below is a summary of the procedures needed to start up the
7AA and complete an automatic grind cycle. The sections following
provided detailed information on each.
1. Machine power up.
2. Machine initialization.
3. Grind parameter entry.
4. Grind mode selection.
5. Place cassettes on elevators.
6. Start machine auto cycle.

Table of Contents