4-32 Sun Fire X4150 Server Service Manual • November 2009
FIGURE 4-18 Installing a Processor (Part 1)
13. Return the server to operation.
a. Install the top cover.
See Section 6.1, “Installing the Top Cover” on page 6-2.
b. Install the server into the rack.
See Section 6.2, “Reinstalling the Server in the Rack” on page 6-3.
c. Reconnect the power cord (or cords) to the power supply (or supplies).
Verify that the AC Present LED is lit.
See Section 6.4, “Powering On the Server” on page 6-6.
d. Power on the server.
See Section 6.4, “Powering On the Server” on page 6-6.