Engine Lubrication System: 1E-7
2) Connect the oil pressure switch lead wire.
NOTE
The SUZUKI BOND should be applied to the
groove of the CKP sensor lead wire grommet
(1).
: Sealant 99000–31140 (SUZUKI Bond
1207B or equivalent)
3) Install the CKP sensor cover. Refer to “CKP Sensor
Removal and Installation: in Section 1H”.
4) Pour engine oil. Refer to “Engine Oil and Filter
Replacement: in Section 0B”.
Oil Pressure Switch Inspection
B649G11506032
Refer to “Oil Pressure Indicator Inspection: in Section
9C”.
Oil Jet (For the Cylinder Head) Removal and
Installation
B649G11506027
Removal
1) Remove the cylinder. Refer to “Engine Top Side
Disassembly: in Section 1D”.
2) Remove the oil jets (1) (for the cylinder head).
Installation
Installation is in the reverse order of removal. Refer to
“Engine Top Side Assembly: in Section 1D”.
Pay attention to the following points:
NOTE
Before installing the oil jets, apply a light coat
of engine oil to the O-rings.
Oil Jet (For the Piston Cooling and
Transmission) Removal and Installation
B649G11506028
1) Remove the engine assembly. Refer to “Engine
Assembly Removal: in Section 1D”.
2) Separate the crankcase, left and right. Refer to
“Engine Top Side Disassembly: in Section 1D” and
“Engine Bottom Side Disassembly: in Section 1D”.
3) Remove the crankshaft assembly. Refer to “Engine
Bottom Side Disassembly: in Section 1D”.
4) Remove the crankshaft journal bearings.
5) Remove the oil jets (1) (for the piston cooling).
6) Remove the oil jets (2) (for the transmission).
I649G1150015-01
1
1
I649G1150016-01
I649G1150017-01
1
1
I649G1150018-02
2
2
I649G1150019-01

Table of Contents