EasyManua.ls Logo

Suzuki 2005 GSF1200 - Page 304

Suzuki 2005 GSF1200
447 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4A-2 Brake Control System and Diagnosis:
GSF1200S
(a)
1
2
(a)
(c)
14
49
42
(b)
(b)
(c)
(a)
2
42
2
3
6
5
(a)
2
7
I649G1410002-04
1. Front brake hose No.1 6: Clamp
: Insert the clamp to the hole of the front fender fully.
2. Front brake hose No.2 7: Front brake hose No.1
: Pass the front brake hose No.1 to the brake hose guide.
3: Stopper
: After the brake hose union has contacted the stopper, tighten the union bolt.
: 23 Nm (2.3 kgf-m, 16.5 lb-ft)
4: Clamp
: After positioning the clamp with the stopper, tighten the clamp bolt.
: 7.5 Nm (0.75 kgf-m, 5.5 lb-ft)
5: Brake hose
: Clamp the brake hose firmly.
: 26 Nm (2.6 kgf-m, 19.0 lb-ft)

Table of Contents

Related product manuals