EasyManua.ls Logo

Suzuki GSX-R1000K5 - Page 318

Suzuki GSX-R1000K5
525 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-16 COOLING AND LUBRICATION SYSTEM
Install the water pump.
NOTE:
Set the water pump shaft end F to the oil pump shaft G as
shown.
Tighten the water pump mounting bolts to the specified
torque.
Water pump mounting bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
NOTE:
Pass the gear position switch lead wire 8 under the water pump
lib.
Connect the water hoses. (10-24)
Install the engine sprocket cover.
Install the gearshift lever.
Pour engine coolant. (2-17)
Pour engine oil. (2-12)
Install the under cowlings. (8-6)
8 N·m
(0.8 kgf-m,
6.0 lb-ft)
SAMPLE

Table of Contents

Related product manuals