EasyManuals Logo
Home>TechnipFMC>Measuring Instruments>Smith Meter AccuLoad III

TechnipFMC Smith Meter AccuLoad III User Manual

TechnipFMC Smith Meter AccuLoad III
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #93 background imageLoading...
Page #93 background image
Section VI – Completing the Installation
MN06135 Issue/Rev. 1.3 (6/17) 87
Figure 67. Flame path verification
Sealing
E
ach of the AccuLoad enclosures can be sealed using standard seal wires. On the AccuLoad S and Q models the
seal wire is threaded through holes in two cover bolts as shown in the following figures.
Feeler gauge test of cover flame path joint, inspect joint around the complete
perimeter using a 0.0015" (0.0381 mm) feeler gauge. (ALIV-Q shown - use the
same procedure for ALIV-S).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TechnipFMC Smith Meter AccuLoad III and is the answer not in the manual?

TechnipFMC Smith Meter AccuLoad III Specifications

General IconGeneral
BrandTechnipFMC
ModelSmith Meter AccuLoad III
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals