EasyManuals Logo

Tektronix 2212 User Manual

Tektronix 2212
250 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #212 background imageLoading...
Page #212 background image
Performance
Tests
C-10
Procedure Steps
Step
1.
Check
Deflection
Accuracy
a.
Connect
a 10
mV
standard-amplitude
signal
from
the
calibration
generator
via
a 50 Q BNC
coaxial
cable
to
the
CH 1 OR X
input
connector.
b. CHECK -
Deflection
accuracy
is
within
the
limits
given
in
Table
C-2 for
each
CH 1 VOL TS/DIV
switch
setting
and
corresponding
standard-amplitude
signal.
Step
2.
Check
Trace
Shift
a.
Set
CH 1 VOLTS/DIV
switch
to 2
mV/division.
b. Rotate
the
VOLTS/DIV
switch
through
the
range.
c. CHECK -
The
trace
shift
should
be
$ 1.0
division.
d.
Set
the
VAR
to
the
minumum
sensitivity,
and
rotate
the
VOLTS/DIV
switch
through
the
range.
e.
CHECK -
The
trace
shift
should
be$
1.0
division.
f.
Move
the
cable
from
the
CH 1 OR X
input
connec-
tor
to
the
CH 2
ORY
input
connector.
Toggle
the
MODE
switch
to CH
2.
g.
Repeat
part
b
through
fusing
the
CH 2
controls.
h.
Push
the
CH 2
INVert
switch
to
the
INV
position.
j. CHECK -
The
trace
shift
should
be$
1.5
division.
Rev
12/92
Appendix
C:
Performance Verification

Table of Contents

Other manuals for Tektronix 2212

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix 2212 and is the answer not in the manual?

Tektronix 2212 Specifications

General IconGeneral
BrandTektronix
Model2212
CategoryTest Equipment
LanguageEnglish

Related product manuals