EasyManuals Logo

Toshiba TOSVERT VF-AS3 User Manual

Toshiba TOSVERT VF-AS3
622 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #96 background imageLoading...
Page #96 background image
E6582062
2. Installation and wiring 2-62
2
9
4 Remove four screws of the top cover (mesh) of the DC
reactor.
Store the removed screws so as not to be lost.
5 Remove the top cover (mesh) from the DC reactor.
6 Check the positions of four mounting holes on the back side
of the DC reactor and mount the DC reactor to the panel.
7 Wire the DC reactor and the terminals [PA/+] and [PO] of the
power terminal block.
Connect two wires (with a crimp-style terminal) from each of
two DC reactor units to [PA/+] and [PO].
Connect two flat braided wires for grounding to the ground-
ing terminals respectively.
8 Mount the top cover (mesh) to the DC reactor and tighten
four screws.
Top cover
Screw
DC reactor
mounting
holes
PO PA/+ Earth wire
Top cover
Screw

Table of Contents

Other manuals for Toshiba TOSVERT VF-AS3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toshiba TOSVERT VF-AS3 and is the answer not in the manual?

Toshiba TOSVERT VF-AS3 Specifications

General IconGeneral
ModelTOSVERT VF-AS3
CategoryInverter
Overload Capacity150% for 60 seconds
Cooling MethodForced Air Cooling
Control MethodV/f control, Sensorless vector control
Braking UnitBuilt-in
Communication ProtocolsModbus RTU, DeviceNet, Profibus DP
Protection FunctionsOvercurrent, Overvoltage, Undervoltage, Overheat, Ground Fault
EnclosureIP20
Operating Temperature-10°C to +50°C
Humidity5-95% (non-condensing)
AltitudeUp to 1000m

Related product manuals