EasyManua.ls Logo

WAGNER TITANUS PRO-SENS - 7.4 Ceilings Feed-through Installation

WAGNER TITANUS PRO-SENS
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TITANUS
PRO·SENS
®
Installation pipe system
06/13
139
Ceilings feed-through
Ceilings feed-through for false ceiling
Figure 80: Installation of ceiling feed-through
To install the ceiling feed-through use the following steps:
1. Before gluing remove dirt and grease with the recommended cleaner.
2. Glue the hose connector to the corresponding T-piece with Tangit glue.
3. For each ceiling feed-through drill a hole of ・ 13mm through the false
ceiling.
4. Install the lead-through by first removing the nut, pushing the hose
sleeve from the bottom through the bore hole and then re-placing and
tightening the nut above the false ceiling.
5. Determine the required length and cut the air sampling hose. Attach the
hose to the sleeve of the ceiling feed-through and the hose connector at
7.4
7.4.1

Table of Contents

Related product manuals