EasyManua.ls Logo

Wood-mizer LT70L DH - Page 62

Wood-mizer LT70L DH
159 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sawmill Operation
Preparing The Sawmill For Towing
4
4-21 60HDdoc102619 Sawmill Operation
cable to fasten blade housing covers.
9. Remove all loose objects from the bed of the mill.
10. Place both fenders in the slots located behind the trailer tires. Raise and secure all but the very front
outrigger.
See the trailer operator’s manual for specific information regarding hitch operation and towing the
sawmill.

Table of Contents

Other manuals for Wood-mizer LT70L DH

Related product manuals