Sawmill Operation
Preparing The Sawmill For Towing
4
4-21 60HDdoc102619 Sawmill Operation
cable to fasten blade housing covers.
9. Remove all loose objects from the bed of the mill.
10. Place both fenders in the slots located behind the trailer tires. Raise and secure all but the very front
outrigger.
See the trailer operator’s manual for specific information regarding hitch operation and towing the
sawmill.