B95W
Transport
08_Transport_en.fm - V1.0 - 1.8.17
267 / 306
8
27
Securing the machine
Empty the dipper and fold it in.
Position the work equipment to be pointing straight ahead.
Rotate the uppercarriage so that the working direction is opposite to the
dozer blade in the “straight ahead” position.
Raise the boom to the specified (Fig. 8-5) height.
Retract the dipperstick.
Retract the intermediate boom.
Raise the support device/dozer blade right up.
Shut down the engine.
Leave the machine and close the door.
Lifting the machine
Attach the machine to the 3-point lifting gear at the points illustrated (Fig. 8-5)
in the correct manner
Ensure correct fastening of the crane lifting harness.
Carefully and smoothly lift the machine.
Notice
Pay attention to the correct length with 3-point lifting gear, as otherwise the
machine can be damaged.