EasyManua.ls Logo

ABB ACS2000 - Page 211

ABB ACS2000
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ACS2000 User manual 2UEA001270 Rev. F 10-31 (32)
Chapter 10 - Troubleshooting and maintenance
10 Frames 2, 3 - Mount the lifting hoist
to the drive per hoist instructions.
Hook up the lifting harness at
locations shown.
Using the hoist, lift the phase
module off the module tray.
11 Place the new module on the tray.
12 Gently push the phase module
back into the rack, ensuring cables
are not pinched against the
cabinet, as far as it goes.
Tighten the fastening bolts that
secure module to cabinet on each
side.

Table of Contents

Related product manuals