ACS2000 User manual 2UEA001270 Rev. F 2-21 (28)
Chapter 2 - Power electronics and cabinet features
Table 2-2 Single-phase power supply requirement
2.4.1.2 Internal control UPS (option)
A battery-based UPS (Uninterruptible Power Supply) is available as an 
option, increasing the control buffer time to 15 minutes after loss of control 
power. In the event of a control power outage, communication to a higher-
level control system will not be lost.
Monitoring of battery health is provided. The battery is located at the 
bottom of the swing frame to allow for easy replacement.  
To prolong battery life when drive control power is shut down, switch the 
battery control module to the “service” setting. When control power is 
restored, the battery control module should be switched back to the 
“12A-h” setting.
2.4.1.3 Converter space heater (option)
When the converter space heater is installed on the drive, an additional 
120 V power supply cable is required. This control supply is wired to 
terminal block X20 as illustrated in Figure 2-17.
Table 2-3 Space heater power supply requirement
2.4.1.4 Motor space heater protection (option)
This option provides a circuit breaker with trip monitoring and a contactor 
for a motor space heater that is provided by the customer. An additional 
120 V power supply cable is required.
Motor space heater currents of up to 5 A continuous are supported.
Single-phase supply voltage
Current (A)*
Frame 1 Frame 2 Frame 3
120 V 5 5 10
230 V 3 3 6
* Depending on option configuration, the actual current consumption may be lower.
Single-phase supply voltage
Current (A)
Frame 1 Frame 2 Frame 3
120 V 7 7 7
230 V 4 4 4