3 Maintenance
3.1 Introduction
Structure of this chapter
This chapter describes all the maintenance activities recommended for the IRB
1200.
It is based on the maintenance schedule found at the beginning of the chapter.
The schedule contains information about required maintenance activities including
intervals, and refers to procedures for the activities.
Each procedure contains all the information required to perform the activity,
including required tools and materials.
The procedures are gathered in different sections and divided according to the
maintenance activity.
Safety information
Observe all safety information before conducting any service work.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter Safety on page 19 before performing any service
work.
The maintenance must be done by qualified personnel in accordance with the
safety requirements set forth in the applicable national and regional standards and
regulations.
Note
If the IRB 1200 is connected to power, always make sure that the IRB 1200 is
connected to protective earth and a residual current device (RCD) before starting
any maintenance work.
For more information see:
Product manual - OmniCore C30
Product manual - OmniCore C90XT
Product manual - OmniCore E10
Product manual - IRC5
Product manual - IRC5 Compact
Robot cabling and connection points on page 106.
Product manual - IRB 1200 115
3HAC046983-001 Revision: S
© Copyright 2014 - 2021 ABB. All rights reserved.