EasyManua.ls Logo

ABB IRB 1200 - Page 130

ABB IRB 1200
906 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Axis 5
xx1400000032
Required tools and equipment
NoteEquipment
The content is defined in the section Stand-
ard toolkit on page 890.
Standard toolkit
Other tools and procedures may be required
if the spare part needs to be replaced. These
are specified in the replacement procedure.
Inspecting timing belts
Use this procedure to inspect timing belts.
InformationAction
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
1
Gain access to each timing belt by removing
the cover.
2
Check the timing belts for damage or wear.3
Check the timing belt pulleys for damage.4
If any damage or wear is detected, the part
must be replaced!
5
Continues on next page
130 Product manual - IRB 1200
3HAC046983-001 Revision: S
© Copyright 2014 - 2021 ABB. All rights reserved.
3 Maintenance
3.3.5 Inspecting timing belts
Continued

Table of Contents

Related product manuals