EasyManua.ls Logo

ABB IRB 5720 - Page 210

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Torx pan head screw: M6x16 A4-
80 (4 pcs)
Option Inverted (3317-1):
Refit the protection tube with the attachment
screws.
3
Locking liquid: 3HAC041807-004
(Loctite 2400)
Apply locking liquid on the screws.
Tightening torque: 10 Nm.
xx2100002492
Refitting the cable harness in the base
NoteAction
xx2100001216
Run the cables through the protection tube.1
xx1300000736
Make sure that the cables are not
twisted. Each cable must be in line
with its position on the base plate.
Make sure that the R1.SMB cable
will run on the correct side of the
R1.MP1, see the figure.
2
Make sure that the markings on the cables
are facing the base cover, when connected.
3
Continues on next page
210 Product manual - IRB 5720
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.4.1 Replacing the axis-1 cassette sealing
Continued

Table of Contents

Related product manuals