EasyManua.ls Logo

ABB IRB 5720 - Page 229

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Person 1, working at the side hole:
xx2000000416
Use caution and push the cable harness
into the wrist.
Tip
This step is best performed by two persons
working together:
Person 1: Put one hand inside the
side cover hole and take a hold of
the cable harness.
Person 2: Take a hold of the cable
harness from inside the wrist.
Together: Move the cable harness
past the axis-5 motor and into the
wrist.
4
Person 2, working at the wrist:
xx1300000746
Torx pan head screw: M6x16 Stainless
steel A2-70
Refit the metal clamp axis-4, inside the arm
tube.
Note
The screws are reached from outside the
upper arm.
5
Tightening torque: 10 Nm.
xx2000000418
xx2000000417
Continues on next page
Product manual - IRB 5720 229
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.5.1 Replacing the arm house cover including the axis-4 cassette sealing
Continued

Table of Contents

Related product manuals