EasyManua.ls Logo

ABB IRB 5720 - Page 230

ABB IRB 5720
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx2000000420
Refit the side cover.
Note
Foundry Plus:
Make sure the gasket is fitted cor-
rectly on the side cover
Use attachment screws made of
stainless steel to fit the side cover.
6
Torx pan head screw: M6x16 Stainless
steel A2-70
DressPack or Foundry Plus:
Refit the back cover with the attachment
screws.
7
Tightening torque: 10 Nm.
Tighten the two screws closest to the outlet
first (shown in figure), to avoid deformation.
Foundry Plus
xx2100002636
DressPack
xx2100002679
Connecting the axis-5 motor cables
NoteAction
Put the motor cables in place in the open-
ing.
1
Torx pan head screw: M3x12 Stainless
steel A2-70
Refit the cable bracket with the screws.2
Connect the motor cables.3
Connect in accordance with the markings
on the connectors.
Tightening torque: 1 NmSecure the power connector with a screw.4
Continues on next page
230 Product manual - IRB 5720
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.5.1 Replacing the arm house cover including the axis-4 cassette sealing
Continued

Table of Contents

Related product manuals