NoteAction
Person 1, working at the side hole:
xx2000000416
Run the cable harness through the cable
guide and then into and through the upper
arm tube.
Tip
This step is best performed by two persons
working together:
• Person 1: Put one hand inside the
side hole of the arm tube and take
a hold of the cable harness.
• Person 2: Take a hold on the cable
harness at the back of the robot.
• Together: Use caution and move the
cable harness into the arm tube.
3
Person 2, working at the back:
xx1700001569
Person 1, working at the side hole:
xx2000000416
Use caution and push the cable harness
into the wrist.
Tip
This step is best performed by two persons
working together:
• Person 1: Put one hand inside the
side cover hole and take a hold of
the cable harness.
• Person 2: Take a hold of the cable
harness from inside the wrist.
• Together: Move the cable harness
past the axis-5 motor and into the
wrist.
4
Person 2, working at the wrist:
xx1300000746
Continues on next page
292 Product manual - IRB 5720
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.7.2 Refitting the cable harness
Continued